|
Trasa Świetokrzyska - Warsaw |
|
The bridge over the Vistula River together with the integration into the existing road system
The bridge over the Vistula River
Lead time: 5.10.1998 – 5.10.2000 Main Contractor: MOSTOSTAL Warszawa S.A Technical specifications:
- Steelwork structure with interacting reinforced concrete slab, suspended on a single A-shaped pylon,
- Bridge length: 475 m
- Bridge width: 30 m
- Length of the longest span: 180 m
- Pylon height: 87.5 m
|