Construction of A1 Motorway Toruń-Stryków form km 215+850 to km 291+000
„Kowal” Interchange – „Sójki” Interchange Section
Implementation period of the project: 08.2010-08.2012
General Contractor: SRB Civil Engineering Ltd., John Sisk&Son Ltd Wilton Works, Roadbrige, BUDBAUM S.A.
Scope of works under supervision:
- construction of the Motorway section of length 29.95 km
- construction of 2 interchanges
- construction of 23 road structures on the course and over the Motorway and construction of 29 slip roads
„Sójki” Interchange – „Kotliska” Interchange Section
Implementation period of the project: 07.2010 – 07.2012
General Contractor: Poldim S.A., Bögl a Krýsl k.s.
Scope of works under supervision:
- construction of the Motorway section of length 15.3 km
- construction of 16 road structures on the course and over the Motorway and 9 slip roads and 1 interchange
„Kotliska” Interchange –„Piątek” Interchange
Implementation period of the project: 08.2010 – 08.2012
General Contractor: Sando Budownictwo, Construcciones Sanchez Dominguez – SANDO S.A.
Scope of works under supervision:
- construction of the Motorway section of length 9 km
- construction of 8 road structures on the course and over the Motorway and 9 slip roads
„Piątek” Interchange – „Stryków” Interchange
Implementation period of the project: 07.2010 – 07.2012
General Contractor: Johann Bunte Bauunternehmung GmbH&Co.KG, Bute Polska Sp. z o.o., Przedsiębiorstwo Robót Mostowych “Mosty-Łódź” S.A., Przedsiębiorstwo Budowy Dróg i Mostów ERBEDIM Sp. z o.o., Przedsiębiorstwo Usług Technicznych INTERCOR Sp. z o.o.
Scope of works under supervision:
- construction of the Motorway section of length 21 km
- construction of 14 road structures on the course and over the Motorway and 5 slip roads
Project Online Service: www.a1kowal-strykow.pl
|