|
Bridge near Kwidzyn – in the implementation |
|
Bridge over the Vistula River near Kwidzyn together with approach roads on route of No. 90 National Road
Implementation period of the project: 09.2010-12.2012
General Contractor: Budimex S.A., Ferrovial Agroman S.A.
Scope of Works under supervision:
- construction of the bridge over the Vistula River, length 808 m
- construction 9 road structures and construction of ecological culverts
- construction of 11.92 km long GP Class road
Project Online Service: www.mostkwidzyn.com.pl
|