Bridge near Kwidzyn – in the implementation

 

Bridge over the Vistula River near Kwidzyn together with approach roads on route of No. 90 National Road

Implementation period of the project: 09.2010-12.2012

General Contractor: Budimex S.A., Ferrovial Agroman S.A.

Scope of Works under supervision:

 

  • construction of the bridge over the Vistula River, length 808 m
  • construction 9 road structures and construction of ecological culverts
  • construction of 11.92 km long GP Class road

 

Project Online Service: www.mostkwidzyn.com.pl