|
The bridge over the Vistula River in Płock |
|
together with the access roads
The bridge over the Vistula River
Lead time: 06.2002 – 10.2005 Main Contractor: Consortium: MOSTY Łódź S.A., Mosty Płock S.A.
Technical specifications:
- Structure: steelwork, box type with a steel orthotropic slab of the platform, suspended on two I-shaped (obelisk type) pylons, located in the median strip,
- Bridge length: 1,200 m
- Length of the longest span: 375 m
- Height of pylons: 63.67 m
Bridge access roads
Lead time: 01. 2005 – 07. 2007 Main Contractor: Consortium: BUDIMEX – DROMEX, Polbud Pomorze
Technical specifications:
- Access roads: Fast Traffic Trunk Class-, dual-carriageway road, 2 traffic lanes in each direction, length 3.4 km
|