Reconstruction of the bridge over Zegrze Reservoir together with the access roads
Lead time: 24.07.2003 r. – 30.11.2004 r Main Contractor: Warszawskie Przedsiębiorstwo Mostowe MOSTY S.A
I. Demolition of the structure of the old bridge
Technical specifications:
- Structure: steel truss girders, riveted, reinforced with an arch, with lanes at the bottom
- Bridge length 340.48 m
- Girder span 6.60 m
- Length of the longest span: 79,10 m
- Structure weight 1,164 Mg
II. Construction of the new bridge
Technical specifications:
- Structure: steel with interacting reinforced concrete slab,
- Bridge length 340.48 m
- Bridge width 12.65 m
- Length of the longest span: 79.10 m
|