Zegrze Bridge
most-zegrze_2913
prevnext

Reconstruction of the bridge over Zegrze Reservoir together with the access roads

Lead time: 24.07.2003 r. – 30.11.2004 r
Main Contractor: Warszawskie Przedsiębiorstwo Mostowe MOSTY S.A

I. Demolition of the structure of the old bridge

Technical specifications:

  • Structure: steel truss girders, riveted, reinforced with an arch, with lanes at the bottom
  • Bridge length 340.48 m
  • Girder span 6.60 m
  • Length of the longest span: 79,10 m
  • Structure weight 1,164 Mg

II. Construction of the new bridge

Technical specifications:

  • Structure: steel with interacting reinforced concrete slab,
  • Bridge length 340.48 m
  • Bridge width 12.65 m
  • Length of the longest span: 79.10 m