|
Lead time: 10.2005 – 09.2007 Main Contractor: Consortium: Kirchner – Mosty Łódź S.A.
Scope of works supervised:
- Construction of „S” Class road, 2 traffic lanes in each direction, length of the section 12.8 km
- Construction of 14 civil engineering objects (bridge, overpasses and passages for agriculture roads) in expressway route, and over- and under the Bypass.
|