|
Lead time: 03. 2008 – 01. 2010 Main Contractor: Polimex-Mostostal
Scope of works supervised:
- Construction of the Fast Traffic Trunk Class road section with cross-section of 1x2+1 traffic lanes, length of the road section – 8.8 km
- Construction of 5 road structures (bridges, overpasses)
|