Lead time: 10. 2007 – 12. 2009 Main Contractor: Mosty - Płock
Scope of works supervised:
- Demolition of the existing overpass: length 404.86 m; width 15.28 m
- Construction of 2 parallel overpasses, each 183 m long and 10.66 wide
- Reconstruction of the existing and addition of the second carriageway of 0.875 km long section of No. 61 National Road
- Reconstruction and upgrading of road systems and road furniture:
- Sanitary sewage system
- Storm-water drainage
- Electricity power lines
- Water supply and distribution network
- Heat distribution network
- Gas grid
- Telecommunication network
|