|
Piotrkow Trybunalski Bypass |
|
Lead time: 05. 2003 – 08. 2005 Main Contractor: HABAU
Scope of works supervised:
- Construction of „G” Class road sections, two traffic lanes in each direction, length of road sections combined – 1.4 km
- Construction and reconstruction of 2 road structures (bridges)
|