|
Reconstruction of DK-7 Nationa Road Jazowa-Elbląg |
|
Jazowa – Elbląg section
Lead time: 07. 2005 – 08. 2007 Main Contractor: Strabag
Scope of works supervised:
- Construction of the “S” Class road, two traffic lanes in each direction, length of the section 7.35 km and length of the „Fast Traffic Trunk Class Road section– 6,54 km
- Construction of 5 civil engineering objects (bridges, overpasses), road culverts.
|